Honolulu - Rigid Core Floor (7" x 48")
Honolulu - Rigid Core Floor (7" x 48")
- FREE Shipping in USA
- 30 Day Returns
- 100% Waterproof
Products features:
5mm total thickness (4mm core +1mm pad is attached) providing heat and sound insulation.20 mil wear layer that protects the design layer from scratches and damage.
Click system for easy installation make it an attractive option for many homeowners and commercial properties.
The planks are 7 inches wide and 48 inches long, providing a sleek and modern look that mimics various types of hardwood flooring patterns.
- Lifetime Warranty for Residential
Shipping
Shipping
Free Shipping is available for orders above $4,000!
Our Freight Shipping Rate at within the US is currently $170. This rate is subject to change and only an estimate.
Shipping Residential with Lift: We will deliver your flooring to a residential location that is easily accessible by a semi-truck. If you reside on a narrow, obstructed, or dead-end street, we suggest having your flooring shipped to a terminal or business with a dock or forklift to avoid delivery problems or additional fees.
Terminal: Our sales team can locate a carrier terminal near you for shipping. Once your flooring has arrived, the carrier will contact you. When you pick up your order, bring a form of identification along with a copy of your bill of lading or tracking/pro number.
Business with a Dock/Forklift: This is not a business located in a residential area. If you have a commercial business or know someone who does with a dock or forklift, we can ship your order there. Please let your salesperson know if your business has a roll-up door or no forklift, and provide a business name when ordering.
Please note that the following are considered non-commercial by the carrier and must be shipped as residential: church, construction, country club, farm, golf course, government site, school, storage facility. All addresses are Google mapped.
Shipment Delivery Times: Delivery dates and times are estimates, and we cannot guarantee specific delivery times or dates. We strongly recommend that you do not schedule installation or equipment rental until you have received your product. Keep in mind that shipments do not travel on weekends or holidays.
When Your Order Has Shipped: Your shipment is scheduled through a third-party company, T-Force, who will book the shipment with the carrier that best suits your needs. You will receive an email from our shipping department containing your tracking information and a copy of your bill of lading. We recommend printing the bill of lading and keeping it handy for reference when your shipment arrives, as it contains the pallet/piece count.
Receiving Your Shipment: Before accepting your flooring, please inspect the freight for any damage, signs of damage, or shortage. Note any damage or shortage on the delivery receipt/bill of lading and have the driver sign it before he leaves.
It is your responsibility to check the packaging, cartons, and pallet conditions for any details that may help you in case you need to file a claim against the carrier. You have the right to hold the carrier at the delivery site until the inspection of the delivery is complete.
Missing/Damaged Product: If you do not receive the total shipment or if there is any damage, it is critical that you note it on the delivery receipt/bill of lading before the driver leaves. Without written damage or missing pieces notated, your recourse is limited. Claims are only valid for damage to your actual product, not cosmetic damage to the packaging.
Concealed Damages: All concealed damage or un-noted shortage must be reported directly to the carrier within 15 calendar days of the shipment delivery date. Concealed damage is any damage observed to the freight that was not provided in writing on the delivery receipt/bill of lading. The carrier may pick up the damaged product(s)
Returns
Returns
Returns and exchanges must be made withinย 30 days of receipt and only with a valid receipt of purchase. Returns or exchanges are not permitted on opened boxes, special or custom orders, close-outs, and odd lots. Defective product may be exchanged, prior to installation, withinย 30 days of receipt. Installed product is considered accepted by you and may not be exchanged or returned for any reason. Shipping and delivery charges in connection with purchase are non-refundable. Shipping costs relating to a return or exchange are your sole responsibility.
For refunds, cash or check purchases will be refunded by check within 5-10 business days; credit or debit card, store credit or gift card purchases will be credited back to the account or tender type used for this purchase.
Installation
Installation
Installation Instructions: SPC Flooring
BEFORE YOU BEGIN INSTALLATION:
Please read all the instructions before you begin the installation. Improper installation will void your warranty. Always check with your dealer or distributor for latest version of these instructions and product warranty.
Check all carton labels to ensure that the colors, size and run/lot numbers match. Installing flooring from different lot numbers can result in differences in shading, texture, gloss and coloring.
General:
This product has a pre-attached underlayment; using additional underlayment will void the warranty and can cause excess deflection which will damage the locking joints. There is no laboratory testing data for sound reduction that supports use of additional acoustic underlayment to further reduce impact sound or sound transmission through the flooring.
The flooring planks will not be damaged by exposure to water, however, the finished floor is not a complete waterproof installation and is not to be used as a moisture barrier. Clear standing water on the flooring as soon as possible. Water left unattended under the flooring with anything organic on the substrate can create a situation where mold and bacteria can be promoted. Any damage to the flooring or the surrounding structures from mold is not covered under the product warranty. Use of a 100% silicone sealant around the perimeter can aid in keeping surface water from migrating under the flooring around the perimeter.
Do not install flooring over carpet or any other type of soft surface flooring.
-
Install flooring in interior areas only with the interior temperatures maintained with properly operating HVAC between 0ยฐF (-18ยฐC) and 125ยฐF (52ยฐC).
-
Use window coverings or UV rated films to limit sun exposure during peak sunlight times. This will help create a more stable temperature and prevent flooring from thermal degradation.
-
Click Lock Flooring does not need to be acclimated, however if the boxes were stored over 2 hours in extreme temperatures (under 50ยฐF [10ยฐC] or over 100ยฐF [40ยฐC]) within the 12 hours before the installation, acclimation is required. In this case, place cartons (stacks of 5 high max.) in installation area at service temperature for at least 8 hours in unopened package before you start the installation.
-
Service temperatures must be maintained consistent between 60ยฐF to 85ยฐF (15ยฐC to 29ยฐC) before and during installation. Gradually increase/decrease service temperature to the normal operating temperature of the area after installation.
-
Always use oversized (minimum 2โ diameter) hard plastic or nylon floor protectors for heavy objects or objects with high point loads (high PSI at bottom of leg/support). Castor chairs should have minimum 2โ diameter wheels.
-
For the best result, make sure to always mix planks from several cartons at a time; mixing the planks during the installation to balance the pattern and colors.
-
Expansion spacing of 1/4โ (6mm) where flooring abuts all vertical surfaces, including walls, columns, jambs, etc. These gaps will be covered with trim moldings after the floor is installed. Tip: When installing around pipes, drill the holes 1โ2โ (12mm) larger than the diameter of the pipes.
-
Installation areas greater than 65 lineal feet (4200 sqft.) should have a 1/2โ expansion space around the perimeter. For floor surfaces exceeding 6400 square feet (600sq m) and/or lengths exceeding 80 linear ft (25m), use expansion moldings at openings less than 6 feet and increase expansion gaps to 1โ2โ (12mm).
-
Maintaining a distance from heat sources such as fireplaces, wood stoves, furnaces, etc. of at least 18โ with ensure a stable installation and limit damage to the flooring. Excessively low or high temperatures may cause this product to expand or contract and lead to visual defects of the floor that will not be warranted.
-
Inspect your subfloor before you begin. It must be dry, clean, flat and smooth prior to installation; all substrates must be or made to be flat to 3/16โ (5mm) within a 10ft (3m) span with cementitious leveling compounds.
-
The flooring planks will not be damaged by exposure to water, however, the finished floor is not a complete waterproof installation and is not to be used as a moisture barrier. This product is also not to be installed in areas that have a risk of excess water exposure or flooding such as commercial showers, saunas, pools or outdoor areas.
-
Do not install cabinets, islands or fixed objects on top of the flooring; flooring should be butted to these with proper expansion spacing.
-
Undercut all doorjambs leaving 1/64โ space above the flooring surface. Do not fasten wall moldings and/or transition strips to the planks or directly through flooring to the subfloor.
-
Click Lock SPC planking is best when installed the length direction of the planks parallel to the main light direction.
-
Inspect each individual plank one by one before installation. No claims on surface defects will be accepted after installation; defects greater than 1โ (1cm) are considered identifiable and should be culled.
Substrates
All subfloors / substrates regardless of type shall be structurally sound, clean and free of any surface contaminant, dry, flat and smooth prior to installation. Substrate flatness requirement for all Click Lock SPC flooring is an F32 rating (3/16โ in 10 lineal feet) or 1/8โ in 6 lineal feet when measured; if necessary, flatness should be achieved by mechanical grinding or sanding or use of a cementitious leveling compound.
For substrates / subfloors not listed below consult your dealer or distributor prior to installation. Wood
All wood substrates should be prepared according to the latest revision of ASTM F1482 Installation and Preparation of Panel Type Underlayments to Receive Resilient Flooring. Acceptable wood panels are:
APA registered underlayment or APA Exterior grade plywood with sanded face exterior grade with minimum rating of B-C plugged face. APA Rated OSB, properly installed with the face fully sanded to ensure seams are even and the face is free of ridges.
Wood panel subfloor construction should be a minimum of 1โ in total thickness. Panels designed as suitable underlayment over unacceptable substrates shall be at a minimum 1โ4โ in thickness, dimensionally stable, fully sanded and have a written manufacturerโs warranty and installation instructions. Panels shall be installed according to manufacturerโs instructions regarding stapling pattern, sanding and filling of joints, and acclimation to installed environment.
Concrete:
Concrete substrates shall be according to the latest version of ASTM F710, Preparing Concrete Floors to Receive Resilient Flooring and ACI 302.1R-15, Guide to Concrete Floor Construction.
All concrete substrates, regardless of grade or age of slab, must be properly tested for moisture per ASTM F 2170 or ASTM F1869. Follow the ASTM test method and the instructions of the manufacture of the test equipment. RH values should be maximum 85% or MVER 6 lbs./1,000 sqft./24 hrs.
Concrete Alkalinity / pH Test shall be conducted in accordance with ASTM F710; the level of pH in the substrate should be โฅ 7 and โค 10.
LW Concrete:
Gypsum and Lightweight Cellular Concrete Substrates shall be per ASTM F2419 or F2471, be clean, dry, flat and smooth as stated above. If leveling is necessary use leveling compounds compatible with the Gypsum or LW concrete subfloor. Moisture testing should be conducted according to F2419 or F2471; acceptable values when using ASTM F4269 are less than 30 of the indicated scale on the meter.
Existing F/C:
ย
For existing hardwood or engineered wood floor surfaces, it is recommended to repair any loose boards or squeaks before you begin the installation and ensure the surface is flat. Existing wood floors should be dry and well ventilated under the flooring. Do not install over glue-down hardwood or engineered hardwood over concrete substrates.
Existing resilient flooring must be single layer only and well bonded to the substrate with no bubbles or open seams. The resilient floor must not have a cushion back, be loose-laid or perimeter bonded only.
Adhesive residue shall be properly prepared by hand scraping, mechanical scraping (non-cutback residue ONLY) or properly covered using a Portland based patching compound properly mixed with the manufacturerโs recommended latex/acrylic additive. Chemical adhesive removers shall not be used. Consult the RFCI Recommended Practice for Removal of Resilient Floor Coverings before installation.
Most tile (ceramic, porcelain, etc.) surfaces are acceptable for use as a substrate. Surface should be flat (no-ledging) and grout joints less than 1โ4โ are acceptable without leveling. Unlevel floors or wider grout joints should be prepared by grinding any high areas and using a suitable Portland-based leveling compound per the manufacturerโs recommendations to fill in any low areas.
In-Floor Radiant Heat
Flooring can be installed over most radiant heat systems. Radiant heat systems must have a minimum of 1/2โ (12mm) separation from the product and be fully embedded in a cementitious leveling compound. Before installing over newly constructed radiant heat systems, operate the system at maximum capacity to force any residual moisture from the cementitious topping of the radiant heat system. Lower temperature of substrate to a maximum of 70ยฐF (21ยฐC) 24 hours before installation.
Once the installation has been completed, the heating system can be turned on and increased gradually the normal service temperature is attained. Maximum operating temperature should never exceed 85ยฐF (29ยฐC) and use of an in-floor temperature sensor is recommended to avoid overheating.
Refer to the radiant heat systemโs manufacturer recommendations for additional guidance.
TOOLS AND SUPPLIES REQUIRED:
Shop vacuum with proper bag and filtration; utility knife with blades; carpenterโs or speed square; chalk line; safety glasses & dust mask; white rubber mallet (or non-marring type); jig saw or small circular saw; knee pads. Moldings and transition strips as required for the installation.
Do not use tapping blocks or other types of laminate or hardwood flooring tools as these may cause damage to the locking mechanism if improperly used.
INSTALLATION:
-
Flooring has the best visual when balanced in the room. Determine the center of the room and measure from the center line to the starting wall to determine if the first row should be cut. Divide this measurement by the width of the planks and if the board width of the first / last row is less than 1โ2 of the plank width, adjust the width of the first row to be installed. In narrow hallways, it is recommended to install the floor parallel to the length of the hall.
-
Calculate the room surface prior to installation and plan an extra 10% of flooring for cutting waste.
-
After thoroughly cleaning the subfloor, you should begin laying the planks from left to right. Always be sure to leave a 1/4โ (6mm) expansion gap at walls and between fixtures, such as pipes and pillars, stairs, etc. Use spacers along the
starting walls to maintain this gapping.
-
Check all locking mechanisms for debris or cracks before installing planks. Failure to do so can result in a loose joint
and will compromise the integrity of the installation.
-
Ensure joints are at least 8โ apart and all pieces are no less than 12โ in length.
ย
-
ALERT: Failure to properly align the end joint and attempting to force planks together while they are out of alignment will result in permanent damage to the end joint
-
To cut the plank, use a utility knife and ruler. With the top side of the plank facing up, use the utility knife to score the plank several times while using the ruler as a straight edge. Snap the plank along the scored line. For ease of installation, cuts may be made using a laminate or vinyl flooring cutter.
-
To cut and lay the last row: position a loose board exactly on top of the last row installed. Place another board on top, with the tongue side touching the wall. Draw a line along the edge of this boards, to mark the first board. Cut along the edge of this board to mark the first board. Cut along this line to obtain the required width. Insert this cut board against the wall. The last row should be no less than 1โ2 of the planksโ actual width. The spacers can then be removed.
NOTE: If you notice both planks are not at the same height or are not locked together well, disassemble the planks by carefully lifting full rows up at a shallow angle and removing from the locking joint. The end joints can then be unlocked by lifting up the end of the last plank in the row and removing from the locking joint on the adjacent plank. Check to see if any debris is stuck inside the lock is obstructing the planks from properly engaging. Before continuing ensure the joint has not sustained any damage and replace any damaged planks.
-
Begin laying planks form the left side of the starting wall and work left to right. The tongue side of the plank shall face the starting wall.
-
Place 1โ4โ (6mm) spacers between the short and long side (left & top) planks and the walls. Always position one spacer where the planks join at the seams.
-
The end joints of the planks in the first row are assembled by inserting the tongue side into the groove side of the previous plank at a low angle. Gradually lower the plank down flat until the end joint closes, ensuring that the planks are perfectly aligned. Install remaining full planks in the first row.
-
The last plank in the first row will need to be cut. Measure the distance between the wall and the surface of the last installed plank. Subtract 5/16โ from this measurement to allow for the spacer. If the length of the cut piece will be less than 8โ, the first plank in the row must be cut enough to make the last piece at least 8โ long. Cut the plank as indicated above.
-
The cut piece from the first row can be used for the starting piece of the second row to maintain a random appearance of the flooring. End joints must be staggered at least 8โ to maintain integrity of the floor.
-
Install the long side of the first plank in the second row by inserting the tongue side into the groove side of the previous row at a low angle and then lower it flat to the substrate.
-
Install the next plank in the second row by inserting the end tongue into the groove of the previously installed plank at a shallow angle with the long side tongue slightly overlapping the groove of the plank in the previous row. Engage the lock by lowering the plank.
-
To engage the long side, lift up both planks at a shallow angle and push the uninstalled plankโs tongue into the groove of the plank in the row above it. Once the tongue is seated the planks can be lowered flat to the substrate.
-
Continue this method for each plank in the subsequent rows while working left to right in the room. Maintain the expansion gapping on all walls.
-
If the planks do not sit flat or bounce up and down slightly, a short piece of scrap material can be inserted into the groove on the long side and gently tapped with a mallet to seat the joints fully.
-
After all planks have been installed replace / reinstall all moldings while keeping a 1/64โ gap above the surface of the finished floor.
ย
MAINTENANCE:
Mop up any spills and excessive liquids immediately; the liquid can migrate to the subfloor and make the surface of the finished flooring slippery and unsafe.
-
Sweep or vacuum daily using soft bristle attachments. For heavier soil removal use of a neutral pH cleaner is recommended; do not use multi-surface cleaners, bleach, heavy abrasives or cleaners that are not pH neutral. Single use wet floor pads are acceptable. Soft white bristle brushes or pads can be used for heavier soil removal.
Click Lock SPC flooring has a urethane finish and does not require any wax, oils or after-market finishes to be applied to the surface of the flooring. If a finish is desired please contact your dealer or distributor for complete instructions.
Residential steam mops are permitted on Click Lock SPC. Use at lowest power with a suitable soft pad and keep the steamer in motion when in use. Refer to the steam mop's manufacturer instructions.
All entryways and exits must have a non-rubber backed mat in place to remove debris and heavy soils, contaminants from shoes.
Furniture should have proper floor protective pads (nylon or felt) installed on the bottom of all legs; this is especially true for any movable furniture. Replace protective pads every 6 months or as needed due to damage or buildup of debris.
Heavy objects and furniture should not be slid or dragged across the floor surface without use of suitable floor moving pads or covering the finished flooring with hardboard or plywood.
For more information, including Warranty Guide, please contact your distributor.
Support
Support
๐ (904) 839-2088
OR click here to send us a message.
SPC Waterproof Flooring:
What is SPC flooring?
SPC flooring (Stone Plastic Composite) is a type of rigid vinyl flooring that is made up of a blend of limestone and polyvinyl chloride (PVC). It is known for its durability, water resistance, and ease of maintenance, making it a popular choice for both residential and commercial spaces.
How does SPC flooring differ from other types of flooring?
SPC flooring differs from other types of flooring in several ways.
Firstly, SPC flooring is a type of vinyl flooring that is composed of a stone-plastic composite (SPC) core layer, making it more rigid and durable than traditional vinyl flooring.
Additionally, SPC flooring is water-resistant, making it ideal for use in high-moisture areas such as bathrooms and kitchens.
Finally, SPC flooring is easy to install, as it can be clicked or locked together without the need for adhesives or nails.
Is SPC flooring waterproof?
Yes, SPC flooring is waterproof due to its composition of stone powder and plastic composites that make it highly durable and resistant to moisture.
What are the benefits of choosing SPC flooring?
- SPC flooring is highly durable and long-lasting, making it an ideal choice for high-traffic areas.
- It is resistant to scratches, stains, and dents, making it a great option for families with children and pets.
- SPC flooring is waterproof, making it perfect for use in areas prone to moisture such as bathrooms, kitchens, and basements.
- It is also easy to maintain and clean, requiring only regular sweeping and mopping.
- SPC flooring is available in a wide variety of colors, styles, and patterns, allowing homeowners to choose a design that suits their aesthetic preferences.
How do I clean and maintain my SPC flooring?
- Regular Cleaning: Sweep or vacuum your SPC flooring regularly to remove dirt, dust, and debris. Use a microfiber mop or a damp cloth to wipe away any spills or stains.
- Deep Cleaning: For deeper cleaning, you can use a pH-neutral cleaner specifically designed for SPC flooring. Avoid using harsh chemicals or abrasive cleaners that can damage the flooring.
- Stain Removal: To remove stains, use a soft-bristled brush and a mild cleaning solution. Avoid using steel wool or scrub pads that can scratch the surface of the flooring.
- Prevention: To prevent scratches and damage, use felt pads under furniture legs and avoid dragging heavy objects across the floor. Place doormats at entryways to prevent dirt and debris from being tracked onto the flooring.
- Maintenance: SPC flooring is highly durable and requires minimal maintenance. However, if the flooring becomes damaged, it may be necessary to replace the affected planks or tiles.
By following these simple tips, you can keep your SPC flooring looking clean and beautiful for many years to come.
Can SPC flooring be installed over existing flooring?
Yes, SPC flooring can be installed over existing flooring as long as the existing floor is clean, flat, and level.
However, it's important to note that the height of the new flooring may cause clearance issues with doors, cabinets, or appliances, so it's essential to take measurements before installation.
Additionally, if the existing floor is not level, it may need to be leveled before installing the SPC flooring.
It's always recommended to follow the manufacturer's guidelines for installation and consult with a professional if you have any doubts or concerns.